Here’s the truth about why most renovations blow out. It’s not bad luck. It’s bad planning.
When a builder gives you a quote filled with allowances, those placeholder numbers like “tile allowance: $3,500,” they’re not protecting you. They’re protecting themselves. It’s a way of estimating low now and sorting it out later. That’s how a $250,000 renovation turns into $310,000 before the project is finished.
Bright Homes doesn’t use allowances. Instead, we invest hundreds of hours before construction begins. We run inspections, use cameras, and 3D scan your home to create exact as built plans. If we cannot see what is behind a wall, we open it and find out. By the time we give you a price, we have done the work to stand behind it.
“We own it,” Jon says. “If something unexpected shows up, that’s our responsibility. Not yours.”
Design and estimating happen together from the very beginning. That means the design you fall in love with is one you can actually build within your budget. You are not sent back and forth between plans and pricing or forced to scale things down after the fact.
When your project is complete, you are backed by a two year workmanship warranty, double the industry standard. Because standing behind our work does not stop when construction ends.